Project Completion Certificate (Ground Water)
Scheme ID: 20020413 Name of Scheme: KARAHKOL GP WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2620 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Aug-2023 Actual Date of Completion (Capex): 24-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 18.02/109.94 KARAHKOL 26.48171 83.496686
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT-PUMP 600/45 KARAHKOL 26.48167 83.496987
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175/16 KARAHKOL 26.481481 83.496549
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE (K9) 150 45
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 6.925
2 HDPE PIPE 75 0.967
3 HDPE PIPE 90 0.8995
4 HDPE PIPE 110 0.4138
5 HDPE PIPE 140 0.4605
6 HDPE PIPE 160 0.0707
HSC Connection
Sno. Total Nos.
1 350
Other Details
1.80
1.80
1.89
24-Jun-2023
15-Dec-2024