Project Completion Certificate (Ground Water)
Scheme ID: 20020416 Name of Scheme: KARANPURA GP WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 2900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Aug-2023 Actual Date of Completion (Capex): 24-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.02/102.34 karanpura 26.427701 83.569497
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT-Pump 650/45 karanpura 26.427701 83.569497
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/16 KARANPURA 26.427721 83.569456
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE (K9) 150 36
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 6.3434
2 HDPE PIPE 75 0.5374
3 HDPE PIPE 90 1.0926
4 HDPE PIPE 110 1.3992
5 HDPE PIPE 125 0.4996
6 HDPE PIPE 140 0.1259
7 HDPE PIPE 160 0.125
HSC Connection
Sno. Total Nos.
1 427
Other Details
2.08
2.08
2.14
24-Jun-2023
15-Dec-2024