Project Completion Certificate (Ground Water)
Scheme ID: 20020451 Name of Scheme: Bhiswa No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 4050 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-May-2024 Actual Date of Completion (Capex): 18-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 26/156.85 Bhiswa 26.60487 83.58193
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 54/40 Bhiswa 26.60487 83.58193
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 250/12 Bhiswa 26.60488 83.58206
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Pipe Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.232 Laying Completed
2 HDPE 75 0.770 Laying Completed
3 90 90 0.304 Laying Completed
4 HDPE 110 0.342 Laying Completed
5 HDPE 140 2.596 Laying Completed
HSC Connection
Sno. Total Nos.
1 627
Other Details
2.70
0.00
2.69
17-Oct-2024
10-Jan-2025