| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20020486 | Name of Scheme: RASOOLPUR | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1850 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 04-May-2024 | Actual Date of Completion (Capex): 16-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.07/127.83 | Rasoolpur | 26.753421 | 83.601569 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 27/40 | Rasoolpur | 26.753421 | 83.601569 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Overhead Tank-1 | 125/12 | Rasoolpur | 26.753606 | 83.6011566 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.902 | Laying Completed |
| 2 | HDPE | 75 | 0.541 | Laying Completed |
| 3 | HDPE | 90 | 0.221 | Laying Completed |
| 4 | HDPE | 110 | 0.469 | Laying Completed |
| 5 | HDPE | 160 | 0.096 | Laying Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 328 |