Project Completion Certificate (Ground Water)
Scheme ID: 20020514 Name of Scheme: Powa Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2200 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Feb-2024 Actual Date of Completion (Capex): 01-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/133.9 Powa 27.0879 83.2007
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 30/40 Powa 27.0879 83.2007
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/12 Powa 27.0879 83.2007
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.01 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.124 Laying Completed
2 HDPE 75 1.123 Laying Completed
3 HDPE 90 0.14 Laying Completed
4 HDPE 140 1.031 Laying Completed
HSC Connection
Sno. Total Nos.
1 310
Other Details
1.80
0.00
1.78
23-May-2025
01-Jun-2026