Project Completion Certificate (Ground Water)
Scheme ID: 20020537 Name of Scheme: KARMAINI No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2950 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-May-2024 Actual Date of Completion (Capex): 08-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.06/129.24 Karmaini 26.758508 83.560634
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 42/41 Karmaini 26.758508 83.560634
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 200/14 Karmaini 26.758526 83.560297
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.030 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.709 Laying Completed
2 HDPE 90 0.237 Laying Completed
3 HDPE 110 0.989 Laying Completed
HSC Connection
Sno. Total Nos.
1 450
Other Details
1.98
0.00
2.02
07-Apr-2024
22-Nov-2024