Project Completion Certificate (Ground Water)
Scheme ID: 20020542 Name of Scheme: Bhasma No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3380 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-May-2024 Actual Date of Completion (Capex): 30-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.06, 126.76 Bhasma 26.6052 83.3948
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 42,42 Bhasma 26.6052 83.3948
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 200,14 Bhasma 26.6052 83.3947
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.474 Laying Completed
2 HDPE 75 0.205 Laying Completed
3 HDPE 90 0.177 Laying Completed
4 HDPE 110 0.230 Laying Completed
5 HDPE 160 0.322 Laying Completed
6 HDPE 200 0.975 Laying Completed
HSC Connection
Sno. Total Nos.
1 548
Other Details
2.59
0.00
2.73
29-Jul-2024
19-Apr-2025