Project Completion Certificate (Ground Water)
Scheme ID: 20020557 Name of Scheme: SHEETAL MANJHA GP WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 1900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Sep-2023 Actual Date of Completion (Capex): 24-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TW 18/104.41 Sheetal Majha 26.412313 83.54921
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT-PUMP 400/45 Sheetal Majha 26.412313 83.54921
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OTH-1 100KL/14M Sheetal Majha 26.412328 83.549208
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe(K9) 100 40
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 4592
2 HDPE PIPE 75 0
3 HDPE PIPE 90 363.5
4 HDPE PIPE 110 1009.2
5 HDPE PIPE 125 1561
6 HDPE PIPE 140 0
7 HDPE PIPE 160 355
8 HDPE PIPE 180 0
9 HDPE PIPE 200 469.3
10 HDPE PIPE 250 0
11 HDPE PIPE 300 0
HSC Connection
Sno. Total Nos.
1 290
Other Details
16259000.17
16259000.17
17125545.94
24-Jun-2025
01-Apr-2025