Project Completion Certificate (Ground Water)
Scheme ID: 20020566 Name of Scheme: Tulsi Ratan No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 1630 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Feb-2024 Actual Date of Completion (Capex): 25-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/123.80 Tulsiratan 26.5890 83.1312
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 24/39 Tulsiratan 26.5890 83.1312
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 100/14 Tulsiratan 26.5890 83.1312
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.01 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.953 Laying Completed
2 HDPE 75 1.486 Laying Completed
3 HDPE 90 0.105 Laying Completed
HSC Connection
Sno. Total Nos.
1 255
Other Details
1.49
0.00
1.49
24-Jun-2025
21-Aug-2025