| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20020769 | Name of Scheme: GANESHPUR | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 5688 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 26-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 37.47 Mtr / 91.92 Mtr | GANESHPUR | 29.145448 | 77.958585 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1200 LPM / 54 Mtr | GANESHPUR | 29.145448 | 77.958585 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350 Kl / 16 M | GANESHPUR | 29.145448 | 77.958585 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 15 | 0.036 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.468 | |
| 2 | HDPE | 90 | 1.154 | |
| 3 | HDPE | 110 | 0.337 | |
| 4 | HDPE | 125 | 0.249 | |
| 5 | HDPE | 140 | 0.283 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 937 |