Project Completion Certificate (Ground Water)
Scheme ID: 20020894 Name of Scheme: Kafarpur No. of Villages: 3 No. of Habitation Covered: 9
Total Population Covered: 3718 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-May-2023 Actual Date of Completion (Capex): 20-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 12.01/50.26 Kafarpur 25.815941 82.735214
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-20HP 800/53.40 Kafarpur 25.815941 82.735214
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250/18 Kafarpur 25.815952 82.735032
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 150 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.474
2 HDPE PIPE PN-6 160 1.231
3 HDPE PIPE PN-6 140 0.683
4 HDPE PIPE PN-6 110 1.608
5 HDPE PIPE PN-6 90 0.657
6 HDPE PIPE PN-6 75 1.532
7 HDPE PIPE PN-6 63 11.620
HSC Connection
Sno. Total Nos.
1 537
Other Details
3.60
3.59
3.09
21-Mar-2026
22-Mar-2026