Scheme ID: 20020921 Name of Scheme: Haripur No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3517 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-May-2023 Actual Date of Completion (Capex): 12-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 36.14/149.42 Haripur 25.553293 82.508778
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-17.5HP 800/52.80 Haripur 25.553293 82.508778
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225/18 Haripur 25.553254 82.508595
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.045
2 HDPE PIPE PN-6 160 0.168
3 HDPE PIPE PN-6 140 0.847
4 HDPE PIPE PN-6 110 2.467
5 HDPE PIPE PN-6 90 1.860
6 HDPE PIPE PN-6 75 1.610
7 HDPE PIPE PN-6 63 13.505
HSC Connection
Sno. Total Nos.
1 398
Other Details
2.91
2.75
2.67
13-Oct-2025
14-Oct-2025