Scheme ID: 20020950 Name of Scheme: SHAHPUR PIRPUR No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2652 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 13-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.08 Mtr / 99.43 Mtr SHAHPUR PIRPUR & NAGLA SANI 29.201362 77.727027
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 50 Mtr SHAHPUR PIRPUR & NAGLA SANI 29.201362 77.727027
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl / 14 M SHAHPUR PIRPUR & NAGLA SANI 29.201362 77.727027
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0321
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.546
2 HDPE 90 2.656
3 HDPE 125 0.741
4 HDPE 140 1.703
HSC Connection
Sno. Total Nos.
1 506
Other Details
3.07
3.07
2.47
03-Nov-2024