Scheme ID: 20020997 Name of Scheme: MADARA No. of Villages: 2 No. of Habitation Covered: 11
Total Population Covered: 5510 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 17-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 36.03 Mtr/ 105.83 Mtr MADARA 27.36031 80.18093
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.3 M³ per Min /45 Mtr MADARA 27.36031 80.18093
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 KL/ 18 Mtr MADARA 27.360282 80.181037
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.02304
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.674
2 HDPE Pipe PN-6, Class PE-100 75 3.353
3 HDPE Pipe PN-6, Class PE-100 90 3.493
4 HDPE Pipe PN-6, Class PE-100 110 3.798
5 HDPE Pipe PN-6, Class PE-100 125 1.663
6 HDPE Pipe PN-6, Class PE-100 180 2.653
7 HDPE Pipe PN-6, Class PE-100 200 1.111
HSC Connection
Sno. Total Nos.
1 647
Other Details
4.35
0.00
4.25
16-Jun-2023
24-Dec-2024