Project Completion Certificate (Ground Water)
Scheme ID: 20021071 Name of Scheme: SINGHPUR GP WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1600 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 13-Aug-2023 Actual Date of Completion (Capex): 06-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 tube well 12/87.2 singpur 26.354196 83.782547
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT-PUMP 350/45 SINGPUR 26.354196 83.782547
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100KL/12M SINGPUR 26.354182 83.782532
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE(K9) 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 1.451
2 HDPE PIPE 75 0
3 HDPE PIPE 90 0.9432
4 HDPE PIPE 110 0.234
5 HDPE PIPE 140 0.091
6 HDPE PIPE 160 0.234
7 HDPE PIPE 180 0.331
8 HDPE PIPE 200 0.08
9 HDPE PIPE 125 0.3745
HSC Connection
Sno. Total Nos.
1 230
Other Details
1.36
1.36
1.36
07-Apr-2024
15-Dec-2024