Project Completion Certificate (Ground Water)
Scheme ID: 20021146 Name of Scheme: MASAUTA PWS SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3843 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 21-Mar-2022 Actual Date of Completion (Capex): 31-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21m/86m masauta 28.706004 77.583255
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 500/55 masauta 28.706004 77.583255
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/16 masauta 28.706004 77.583255
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 19.2
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.025
2 HDPE 75 .144
3 HDPE 90 .275
4 HDPE 110 .045
5 HDPE 140 .231
6 HDPE 160 .447
HSC Connection
Sno. Total Nos.
1 429
Other Details
1.44
1.49
1.49
28-Feb-2025
01-Mar-2025