Project Completion Certificate (Ground Water)
Scheme ID: 20021256 Name of Scheme: BANSGAON JJM SCHEME No. of Villages: 2 No. of Habitation Covered: 0
Total Population Covered: 1734 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Feb-2024 Actual Date of Completion (Capex): 17-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18M/111.80M Bansgaon 28.02311 80.49052
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 400M3/44M Bansgaon 28.02311 80.49052
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150KL/14M Bansgaon 28.023182 80.490125
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.004
2 HDPE 75 0.300
3 HDPE 90 4.035
4 HDPE 110 0.159
5 HDPE 140 0.160
HSC Connection
Sno. Total Nos.
1 279
Other Details
1.48
0.00
1.56
17-Jun-2024
18-Jun-2024