Project Completion Certificate (Ground Water)
Scheme ID: 20021259 Name of Scheme: PATEHARA SUNDA JJM SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3416 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Feb-2024 Actual Date of Completion (Capex): 01-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27/120.8 Patehra 27.875111 80.889488
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 800/42 Patehra 27.880987 80.883248
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/16 Patehra 27.881064 80.883435
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 150 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 11.426
2 HDPE Pipe 75 2.644
3 HDPE Pipe 90 2.723
4 HDPE Pipe 110 1.568
5 HDPE Pipe 140 0.847
6 HDPE Pipe 160 0.023
HSC Connection
Sno. Total Nos.
1 497
Other Details
2.74
0.00
2.73
30-Apr-2024
01-May-2024