| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20021270 | Name of Scheme: MUDIYA MISHRA PUR | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 3517 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Feb-2024 | Actual Date of Completion (Capex): 04-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30M/118.8M | Mudiya Mishra | 28.083661 | 80.630784 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP | 750LPM/40M | Mudiya Mishra | 28.083661 | 80.630784 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200KL/14M | Mudiya Mishra | 28.083660 | 80.630783 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 150 | 0.165 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 8.275 | |
| 2 | HDPE PIPE | 75 | 1.326 | |
| 3 | HDPE PIPE | 90 | 5.406 | |
| 4 | HDPE PIPE | 110 | 0.538 | |
| 5 | HDPE PIPE | 140 | 0.059 | |
| 6 | HDPE PIPE | 160 | 0.021 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 555 |