Project Completion Certificate (Ground Water)
Scheme ID: 20021546 Name of Scheme: NIVA WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2440 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 14-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.02/125.58 NIVA 26.923494 83.266079
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 33/42 NIVA 26.923494 83.266079
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 175/14 NIVA 26.923585 83.266099
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.007 Completed
2 HDPE 75 1.545 Completed
3 HDPE 90 0.366 Completed
4 HDPE 110 0.514 Completed
5 HDPE 140 0.755 Completed
6 HDPE 160 1.656 Completed
HSC Connection
Sno. Total Nos.
1 385
Other Details
2.02
0.00
2.13
13-Feb-2024
11-Dec-2024