| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20021708 | Name of Scheme: Karaunda Hati Village Water Supply Scheme Reorgination | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 6273 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 05-Mar-2024 | Actual Date of Completion (Capex): 15-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 MM | 120 MTR PLAIN PIPE | OHT CAMPUS | 29.46597 | 77.398503 |
| 2 | 200 MM | 80 MTR PLAIN PIPE | OHT CAMPUS | 29.46597 | 77.398503 |
| 3 | 200 MM | 100 MTR SLOTTED PIE | OHT CAMPUS | 29.46597 | 77.398503 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 15 HP | 600 M/ HEAD (53 MTR) | OHT CAMPUS | 29.46597 | 29.46597 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | CONCRETE | 150 KL/ 12 MTR | OHT CAMPUS | 29.46597 | 77.398503 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 125 | 0.06 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.337 | |
| 2 | HDPE | 75 | 0.634 | |
| 3 | HDPE | 90 | 0.087 | |
| 4 | HDPE | 110 | 0.465 | |
| 5 | HDPE | 125 | 0.277 | |
| 6 | HDPE | 140 | 0.308 | |
| 7 | HDPE | 160 | 0.102 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1051 |