Project Completion Certificate (Ground Water)
Scheme ID: 20021753 Name of Scheme: PARSA MOHADDINPUR No. of Villages: 3 No. of Habitation Covered: 12
Total Population Covered: 6560 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 07-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 32Mtr/ 88Mtr PARSA MOHADDINPUR 27.149396 80.627478
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.5 M³ per Min /48Mtr PARSA MOHADDINPUR 27.149396 80.627478
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 500 KL / 16 Mtr PARSA MOHADDINPUR 27.149472 80.627585
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.01522
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 7.062
2 HDPE Pipe PN-6: Class PE-100 75 5.779
3 HDPE Pipe PN-6: Class PE-100 90 4.838
4 HDPE Pipe PN-6: Class PE-100 110 2.766
5 HDPE Pipe PN-6: Class PE-100 125 3.195
6 HDPE Pipe PN-6: Class PE-100 140 1.571
7 HDPE Pipe PN-6: Class PE-100 180 2.744
8 HDPE Pipe PN-6: Class PE-100 200 0.492
HSC Connection
Sno. Total Nos.
1 945
Other Details
4.30
0.00
4.35
06-Jan-2024
24-Dec-2024