| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20021773 | Name of Scheme: Pilkhini Dhamgara | No. of Villages: 2 | No. of Habitation Covered: 8 |
| Total Population Covered: 3860 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2023 | Actual Date of Completion (Capex): 16-Sep-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 25.03Mtr/ 116.33Mtr | Pilkhini Dhamgara | 27.030404 | 80.363945 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.9M³ per Min /45Mtr | Pilkhini Dhamgara | 27.030404 | 80.363945 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 250KL/ 16Mtr | Pilkhini Dhamgara | 27.030333 | 80.363877 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 150 | 0.01956 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 5.775 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 6.615 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 1.952 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 0.753 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 140 | 1.004 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 160 | 0.372 | |
| 7 | HDPE Pipe PN-6, Class PE-100 | 180 | 0.216 | |
| 8 | HDPE Pipe PN-6, Class PE-100 | 200 | 0.174 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 462 |