| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20021817 | Name of Scheme: BADEHAR GRANT | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2227 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2025 | Actual Date of Completion (Capex): 02-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 500LPM | 148.58 | BADHERGRANT | 27.350915 | 83.042216 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 500LPM | BADHERGRANT | 27.350915 | 83.042216 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150KL/12M | BADHERGRANT | 27.350988 | 83.042145 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K9 | 100 | 25 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PE100PN06 /HDPE | 63 | 3104.60 | |
| 2 | PE100PN06 /HDPE | 75 | 170 | |
| 3 | PE100PN06 /HDPE | 90 | 2137 | |
| 4 | PE100PN06 /HDPE | 110 | 511 | |
| 5 | PE100PN06 /HDPE | 125 | 228 | |
| 6 | PE100PN06 /HDPE | 140 | 384 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 343 |