Project Completion Certificate (Ground Water)
Scheme ID: 20021817 Name of Scheme: BADEHAR GRANT No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2227 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 02-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 500LPM 148.58 BADHERGRANT 27.350915 83.042216
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500LPM BADHERGRANT 27.350915 83.042216
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150KL/12M BADHERGRANT 27.350988 83.042145
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K9 100 25
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PE100PN06 /HDPE 63 3104.60
2 PE100PN06 /HDPE 75 170
3 PE100PN06 /HDPE 90 2137
4 PE100PN06 /HDPE 110 511
5 PE100PN06 /HDPE 125 228
6 PE100PN06 /HDPE 140 384
HSC Connection
Sno. Total Nos.
1 343
Other Details
1.76
1.66
1.60
15-Jan-2025
12-Apr-2025