| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20021831 | Name of Scheme: Kusumi GP Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 2568 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 16-Jul-2023 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 17(m) / 62(m) | Kusumi | 26.014042 | 81.242876 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 700(M³) / 45(Mtr.) | Kusumi | 26.014042 | 81.242876 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 200 (KL) / 16(Mtr.) | Kusumi | 26.014042 | 81.242876 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K9 | 150 | 0.012 | |
| 2 | DI-K9 | 100 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.676 | |
| 2 | HDPE | 75 | 5.632 | |
| 3 | HDPE | 90 | 2.661 | |
| 4 | HDPE | 110 | 3.255 | |
| 5 | HDPE | 125 | 1.508 | |
| 6 | HDPE | 140 | 0.445 | |
| 7 | HDPE | 160 | 0.334 | |
| 8 | HDPE | 180 | 0.048 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 530 |