Project Completion Certificate (Ground Water)
Scheme ID: 20021853 Name of Scheme: Shadipur Gram Panchayat Water Supply No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 4091 Base Year: 2023 Intermediate Year: 2038 Design Year: 2058
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 10-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 22 / 143.59 Haris singh Ka bhogla 29.53421 78.42169
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 850 /62 Haris singh Ka bhogla 29.53421 78.42169
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 /18 Haris singh Ka bhogla 29.53421 78.42169
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.928
2 HDPE 75 0.794
3 HDPE 90 1.122
4 HDPE 110 0.451
5 HDPE 125 0.247
6 HDPE 140 0.322
7 HDPE 160 0.078
8 HDPE 180 0.066
HSC Connection
Sno. Total Nos.
1 830
Other Details
2.87
0.00
2.91
10-Apr-2026
11-Apr-2026