| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20021919 | Name of Scheme: Athai Jamruddin Gram Panchayat Water Supply | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3159 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 29-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE-WELL | 33.08/114.16 | Athai Jamruddin | 29.224622 | 29.224622 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 700/48 | Athai Jamruddin | 29.224622 | 29.224622 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 kl / 12 mtr | Athai Jamruddin | Athai Jamruddin | Athai Jamruddin |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.0975 | |
| 2 | HDPE | 75 | 1.3929 | |
| 3 | HDPE | 90 | 0.142 | |
| 4 | HDPE | 110 | 0.272 | |
| 5 | HDPE | 125 | 0.3885 | |
| 6 | HDPE | 160 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 150 | 0.0224 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 418 |