Project Completion Certificate (Ground Water)
Scheme ID: 20022067 Name of Scheme: Dinkarpur No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3691 Base Year: 2022 Intermediate Year: 2037 Design Year: 2053
Date of Completion (As per Contract): 16-Sep-2022 Actual Date of Completion (Capex): 25-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.20 M / 97.07 M DINKARPUR 29.36106 77.607633
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 800 LPM / 49 M DINKARPUR 29.36106 77.607633
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL / 12 M DINKARPUR 29.36106 77.607633
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 200 0.043
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.662
2 HDPE 75 0.402
3 HDPE 63 4.357
4 HDPE 110 0.289
5 HDPE 125 0.065
6 HDPE 140 0.127
7 HDPE 160 0.115
HSC Connection
Sno. Total Nos.
1 907
Other Details
2.61
0.00
2.61
25-Dec-2023
26-Dec-2023