| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20022067 | Name of Scheme: Dinkarpur | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3691 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Sep-2022 | Actual Date of Completion (Capex): 25-Sep-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30.20 M / 97.07 M | DINKARPUR | 29.36106 | 77.607633 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 800 LPM / 49 M | DINKARPUR | 29.36106 | 77.607633 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225 KL / 12 M | DINKARPUR | 29.36106 | 77.607633 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 200 | 0.043 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.662 | |
| 2 | HDPE | 75 | 0.402 | |
| 3 | HDPE | 63 | 4.357 | |
| 4 | HDPE | 110 | 0.289 | |
| 5 | HDPE | 125 | 0.065 | |
| 6 | HDPE | 140 | 0.127 | |
| 7 | HDPE | 160 | 0.115 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 907 |