Project Completion Certificate (Ground Water)
Scheme ID: 20022187 Name of Scheme: Muhammadpur Rai Singh No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5710 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Sep-2022 Actual Date of Completion (Capex): 08-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.17 M / 115.01 M MUHAMMADPUR RAI SINGH 29.352184 77.458047
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 1100 LPM / 59 M MUHAMMADPUR RAI SINGH 29.352184 77.458047
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 KL / 14 M MUHAMMADPUR RAI SINGH 29.352184 77.458047
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 200 0.046
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.316
2 HDPE 75 1.225
3 HDPE 63 5.969
4 HDPE 125 0.382
5 140 140 0.038
6 HDPE 160 0.108
HSC Connection
Sno. Total Nos.
1 1007
Other Details
3.57
0.00
3.57
10-Mar-2024
11-Mar-2024