| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20022206 | Name of Scheme: ILLAHBANS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3500 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 16-Sep-2022 | Actual Date of Completion (Capex): 06-Oct-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30.19 M / 103.24 M | ILLAHBAS | 29.475306 | 77.971628 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 700 LPM / 49 M | ILLAHBAS | 29.475306 | 77.971628 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL / 14 M | ILLAHBAS | 29.475306 | 77.971628 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 200 | 39.16 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.22059 | |
| 2 | HDPE | 75 | 0.54616 | |
| 3 | HDPE | 63 | 5.34967 | |
| 4 | HDPE | 110 | 0.11056 | |
| 5 | HDPE | 125 | 1.95694 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 645 |