Project Completion Certificate (Ground Water)
Scheme ID: 20022206 Name of Scheme: ILLAHBANS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3500 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Sep-2022 Actual Date of Completion (Capex): 06-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.19 M / 103.24 M ILLAHBAS 29.475306 77.971628
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 700 LPM / 49 M ILLAHBAS 29.475306 77.971628
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL / 14 M ILLAHBAS 29.475306 77.971628
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 200 39.16
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.22059
2 HDPE 75 0.54616
3 HDPE 63 5.34967
4 HDPE 110 0.11056
5 HDPE 125 1.95694
HSC Connection
Sno. Total Nos.
1 645
Other Details
2.85
0.00
2.85
06-Jan-2024
07-Jan-2024