Project Completion Certificate (Ground Water)
Scheme ID: 20022491 Name of Scheme: JAITPUR JAMANAPAR PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1850 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 17-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.03 Mtr/101.90 Mtr Jaitpur Jamnapar 26.751652* 78.878266*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 25 M^3/ 52 Mtr Jaitpur Jamnapar 26.751652* 78.878266*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 KL/12 Mtr Jaitpur Jamnapar 26.751652* 78.878266*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.067
2 HDPE 75 1.491
3 HDPE 90 0.793
4 HDPE 110 0.923
5 HDPE 140 0.737
6 HDPE 160 .307
7 HDPE 180 0.292
HSC Connection
Sno. Total Nos.
1 333
Other Details
1.44
1.90
19008.00
17-Feb-2024
18-Feb-2024