| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20022492 | Name of Scheme: Katahara PWS | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 2635 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 29-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 18 mtr/125.33 mtr | KATAHARA | 26.799091* | 79.275831* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 36 (M3/Hr.)/ 45 Mtr. | KATAHARA | 26.799091* | 79.275831* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175 KL /16 MTR | KATAHARA | 26.799091* | 79.275831* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.026 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.933 | |
| 2 | HDPE | 75 | 2.251 | |
| 3 | HDPE | 90 | 1.434 | |
| 4 | HDPE | 110 | 1.306 | |
| 5 | HDPE | 140 | 0.965 | |
| 6 | HDPE | 160 | 0.398 | |
| 7 | HDPE | 180 | 0.075 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 445 |