Project Completion Certificate (Ground Water)
Scheme ID: 20022735 Name of Scheme: Gazipur Water Supply Schem No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 1740 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 09-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15.05 M / 71.48 M Gazipur 26.92012 79.419595
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KL/ 16 M Gazipur 26.920006 79.41975
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.013
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.305
2 HDPE 75 1.575
3 HDPE 90 0.545
4 HDPE 110 1.418
5 HDPE 140 0.09
HSC Connection
Sno. Total Nos.
1 280
Other Details
1.41
1.46
1.46
14-Nov-2024
15-Nov-2024