| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20022755 | Name of Scheme: Ram Nagar Village Water Supply Scheme | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 1900 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-May-2023 | Actual Date of Completion (Capex): 01-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 12.07 Mtr./50.55 Mtr. | Ram Nagar | 26.874429 | 79.600198 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (30 M3/Hr.) / 42 Mtr. | Ram Nagar | 26.874429 | 79.600198 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100 KL/ 12 Mtr. | Ram Nagar | 26.879405 | 79.626344 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.0125 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.36 | |
| 2 | HDPE | 75 | 0.32 | |
| 3 | HDPE | 110 | 1.578 | |
| 4 | HDPE | 140 | 0.844 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |