Project Completion Certificate (Ground Water)
Scheme ID: 20022758 Name of Scheme: Sarai Khati Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1280 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 28-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.524
2 HDPE 90 .940
3 HDPE 140 .036
HSC Connection
Sno. Total Nos.
Other Details
1.12
1.24
1.24
31-Mar-2024
01-Jan-2024