Project Completion Certificate (Ground Water)
Scheme ID: 20022797 Name of Scheme: PIPONA No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2791 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 12-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24 M/ 108.8 M PIPONA 27.234333 80.250645
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.600 M³ per Min /44Mtr PIPONA 27.234333 80.250645
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 16 Mtr PIPONA 27.234459 80.252084
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 150 0.01876
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.8835
2 HDPE Pipe PN-6, Class PE-100 75 2.149
3 HDPE Pipe PN-6, Class PE-100 90 1.440
4 HDPE Pipe PN-6, Class PE-100 110 0.602
5 HDPE Pipe PN-6, Class PE-100 125 0.105
6 HDPE Pipe PN-6, Class PE-100 140 2.182
7 HDPE Pipe PN-6, Class PE-100 160 0.9826
HSC Connection
Sno. Total Nos.
1 405
Other Details
2.94
0.00
2.88
11-Dec-2023
24-Dec-2024