Project Completion Certificate (Ground Water)
Scheme ID: 20022958 Name of Scheme: TALWAR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4230 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Feb-2024 Actual Date of Completion (Capex): 04-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.08 Mtr/ 106.92M Talwar 28.765668 78.558495
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 17.5 HP Submersible Pump 57.6 cum / 48 M Talwar 28.765668 78.558495
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 300 KL/ 16 M Talwar 28.765668 78.558495
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.806
2 HDPE Pipe PN-6: Class PE-100 75 0.636
3 HDPE Pipe PN-6: Class PE-100 63 5.882
4 HDPE Pipe PN-6: Class PE-100 110 0.43
5 HDPE Pipe PN-6: Class PE-100 140 0.547
6 HDPE Pipe PN-6: Class PE-100 200 0.216
7 DI Pipe 250 .210
HSC Connection
Sno. Total Nos.
Other Details
2.47
2.66
2.66
04-Mar-2024
05-Mar-2024