Project Completion Certificate (Ground Water)
Scheme ID: 20022979 Name of Scheme: PURA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4150 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Feb-2024 Actual Date of Completion (Capex): 25-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.10 Mtr/ 76.79 M Pura 28.409228 78.697757
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 54.00 cum / 45M Pura 28.409228 78.697757
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 250KL/ 13 M Pura 28.409228 78.697757
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.331
2 HDPE Pipe PN-6: Class PE-100 75 0.764
3 HDPE Pipe PN-6: Class PE-100 63 6.227
4 HDPE Pipe PN-6: Class PE-100 110 0.335
5 HDPE Pipe PN-6: Class PE-100 140 0.181
6 HDPE Pipe PN-6: Class PE-100 160 0.115
7 HDPE Pipe PN-6: Class PE-100 200 0.082
HSC Connection
Sno. Total Nos.
1 690
Other Details
2.18
2.28
2.28
25-Aug-2024
26-Aug-2024