Project Completion Certificate (Ground Water)
Scheme ID: 20022984 Name of Scheme: FAIZULLAPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3160 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Feb-2024 Actual Date of Completion (Capex): 29-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12.01 Mtr/ 93.23 M FAIZULLAPUR 28.5073688 78.9074299
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5 HP Submersible Pump 20.4 cum / 45 M FAIZULLAPUR 28.5073688 78.9074299
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 100 Kl 13 M Staging FAIZULLAPUR 28.5073688 78.9074299
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .04075
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.615
2 HDPE Pipe PN-6: Class PE-100 75 0.026
3 HDPE Pipe PN-6: Class PE-100 63 3.673
4 HDPE Pipe PN-6: Class PE-100 90 110 .161
5 HDPE Pipe PN-6: Class PE-100 90 140 .117
HSC Connection
Sno. Total Nos.
Other Details
1.39
1.43
1.43
17-Apr-2024
18-Apr-2024