Scheme ID: 20022987 Name of Scheme: Bhulainpur water supply scheme No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 1700 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 01-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.0 Mtr./154.66 Mtr. Bhulainpur 26.69109733 79.31739714
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (25.5 M3/Hr.)/41 Mtr. Bhulainpur 26.69109733 79.31739714
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Bhulainpur 26.691113292 79.31734524
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 .011
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.57
2 HDPE 75 .18
3 HDPE 90 1.11
4 HDPE 110 .15
5 HDPE 140 .044
HSC Connection
Sno. Total Nos.
1 284
Other Details
1.40
1.45
1.45
09-Aug-2024