| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20022987 | Name of Scheme: Bhulainpur water supply scheme | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 1700 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-May-2023 | Actual Date of Completion (Capex): 01-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 18.0 Mtr./154.66 Mtr. | Bhulainpur | 26.69109733 | 79.31739714 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (25.5 M3/Hr.)/41 Mtr. | Bhulainpur | 26.69109733 | 79.31739714 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/12 | Bhulainpur | 26.691113292 | 79.31734524 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | .011 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.57 | |
| 2 | HDPE | 75 | .18 | |
| 3 | HDPE | 90 | 1.11 | |
| 4 | HDPE | 110 | .15 | |
| 5 | HDPE | 140 | .044 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 284 |