Project Completion Certificate (Ground Water)
Scheme ID: 20023076 Name of Scheme: NEWADA HARDOI No. of Villages: 4 No. of Habitation Covered: 8
Total Population Covered: 4250 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 20-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 27.04Mtr/ 124.14Mtr NEWADA HARDOI 27.413568 80.212293
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.95 M³ per Min /45Mtr NEWADA HARDOI 27.413568 80.212293
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275KL/ 16Mtr NEWADA HARDOI 27.413662 80.212227
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.0251
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 6.446
2 HDPE Pipe PN-6, Class PE-100 75 5.198
3 HDPE Pipe PN-6, Class PE-100 90 4.378
4 HDPE Pipe PN-6, Class PE-100 110 2.391
5 HDPE Pipe PN-6, Class PE-100 125 0.890
6 HDPE Pipe PN-6, Class PE-100 140 0.378
7 HDPE Pipe PN-6, Class PE-100 160 3.822
8 HDPE Pipe PN-6, Class PE-100 200 1.001
HSC Connection
Sno. Total Nos.
1 586
Other Details
3.82
0.00
3.52
19-Feb-2024
25-Dec-2024