Project Completion Certificate (Ground Water)
Scheme ID: 20023194 Name of Scheme: CHAKORI GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3141 Base Year: 2023 Intermediate Year: 2023 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 01-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.10/99.09 Chakori 28.7294 78.3374
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 633/52.26 Chakori 28.7294 78.3374
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 200/12 Chakori 28.7295 78.3376
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 63 3.3549
2 PN-6 PE100/HDPE 75 3.5973
3 PN-6 PE100/HDPE 90 0.84357
4 PN-6 PE100/HDPE 110 0.2294
5 PN-6 PE100/HDPE 125 0.1008
6 PN-6 PE100/HDPE 140 0.8724
7 PN-6 PE100/HDPE 160 0.506
HSC Connection
Sno. Total Nos.
1 575
Other Details
2.30
2.23
0.00
15-Dec-2024
16-Dec-2024