Project Completion Certificate (Ground Water)
Scheme ID: 20023240 Name of Scheme: Kawar WS No. of Villages: 1 No. of Habitation Covered: 317
Total Population Covered: 2457 Base Year: 2022 Intermediate Year: 2027 Design Year: 2032
Date of Completion (As per Contract): 25-May-2024 Actual Date of Completion (Capex): 25-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer 24 Kawar 25.371296 83.179718
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 550/16 Kawar 25.371296 83.179718
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 service reservoir 175/16 Kawar 25.371296 83.179718
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.045
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.247
2 HDPE 75 1.795
3 HDPE 63 4.83
4 HDPE 110 0.134
5 HDPE 125 0.066
6 HDPE 140 0.187
7 HDPE 160 0.057
8 HDPE 180 0.379
9 HDPE 200 0.067
HSC Connection
Sno. Total Nos.
1 317
Other Details
2.42
2.42
2.42
25-May-2024
26-May-2024