| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023240 | Name of Scheme: Kawar WS | No. of Villages: 1 | No. of Habitation Covered: 317 |
| Total Population Covered: 2457 | Base Year: 2022 | Intermediate Year: 2027 | Design Year: 2032 |
| Date of Completion (As per Contract): 25-May-2024 | Actual Date of Completion (Capex): 25-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Strainer | 24 | Kawar | 25.371296 | 83.179718 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 550/16 | Kawar | 25.371296 | 83.179718 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | service reservoir | 175/16 | Kawar | 25.371296 | 83.179718 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.045 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.247 | |
| 2 | HDPE | 75 | 1.795 | |
| 3 | HDPE | 63 | 4.83 | |
| 4 | HDPE | 110 | 0.134 | |
| 5 | HDPE | 125 | 0.066 | |
| 6 | HDPE | 140 | 0.187 | |
| 7 | HDPE | 160 | 0.057 | |
| 8 | HDPE | 180 | 0.379 | |
| 9 | HDPE | 200 | 0.067 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 317 |