Project Completion Certificate (Ground Water)
Scheme ID: 20023261 Name of Scheme: Ismailganj No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2500 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Mar-2024 Actual Date of Completion (Capex): 02-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.2 /61.21 ISMAIL GANJ 26.32946626 82.59480502
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 650 LPM ISMAIL GANJ 26.32946626 82.59480502
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL / 12 mtr ISMAIL GANJ 26.32946626 82.59480502
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 150 20
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 63 5.075
2 HDPE PN-6 75 0.459
3 HDPE PN-6 90 0.871
4 HDPE PN-6 110 0.05
5 HDPE PN-6 140 0.28
6 HDPE PN-6 160 0.697
7 HDPE PN-6 200 0.104
HSC Connection
Sno. Total Nos.
1 363
Other Details
1.93
2.25
1.65
20-Dec-2025
02-Jan-2026