| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023278 | Name of Scheme: Tripath WS | No. of Villages: 1 | No. of Habitation Covered: 386 |
| Total Population Covered: 1940 | Base Year: 2022 | Intermediate Year: 2027 | Design Year: 2032 |
| Date of Completion (As per Contract): 28-Mar-2024 | Actual Date of Completion (Capex): 28-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Strainer | 18 | Tripath | 25.349752 | 83.7292 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 450/12 | Tripath | 25.349752 | 83.7292 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Reservoir | 125/12 | Tripath | 25.349752 | 83.7292 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 80 | 0.045 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.95 | |
| 2 | HDPE | 75 | 1.132 | |
| 3 | HDPE | 63 | 4.235 | |
| 4 | HDPE | 110 | 0.426 | |
| 5 | HDPE | 160 | 0.271 | |
| 6 | HDPE | 180 | 0.027 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 386 |