Project Completion Certificate (Ground Water)
Scheme ID: 20023308 Name of Scheme: Umarawa No. of Villages: 4 No. of Habitation Covered: 20
Total Population Covered: 4744 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Mar-2024 Actual Date of Completion (Capex): 28-Dec-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.2 /61.21 Umrawan 26.436133 82.300642
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 950 LPM Umrawan 26.436133 82.300642
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 KL / 18 mtr Umrawan 26.436133 82.300642
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 20
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
HSC Connection
Sno. Total Nos.
1 633
Other Details
3.06
3.56
2.41
25-Dec-2025
28-Dec-2025