Project Completion Certificate (Ground Water)
Scheme ID: 20023318 Name of Scheme: Naripur Mehnajpur No. of Villages: 2 No. of Habitation Covered: 13
Total Population Covered: 4445 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Mar-2024 Actual Date of Completion (Capex): 12-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30 /61.21 Naripur Mehnajpur 26.3599308 82.6841906
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL / 18 mtr Naripur Mehnajpur 26.3599308 82.6841906
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 63 12.383
2 HDPE PN-6 75 1.256
3 HDPE PN-6 90 1.485
4 HDPE PN-6 110 0.984
5 HDPE PN-6 140 0.479
6 HDPE PN-6 160 0.927
7 HDPE PN-6 200 0.062
HSC Connection
Sno. Total Nos.
Other Details
2.77
3.25
2.45
10-Jan-2026
12-Jan-2026