Project Completion Certificate (Ground Water)
Scheme ID: 20023350 Name of Scheme: BHASAULA GP WSS No. of Villages: 2 No. of Habitation Covered: 1
Total Population Covered: 1415 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Mar-2025 Actual Date of Completion (Capex): 08-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 148.25 BHUSAULA MAFI 27.243665 83.147194
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE 350 LPM BHUSAULA MAFI 27.243665 83.147194
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100KL/12M BHUSAULA MAFI 27.311993 83.262811
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K9 100 0.0025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 / PE100 63 2865.50
2 HDPE PN6 / PE100 75 .280
3 HDPE PN6 / PE100 90 0.108
4 HDPE PN6 / PE100 110 .803
5 HDPE PN6 / PE100 125 .511
HSC Connection
Sno. Total Nos.
1 220
Other Details
1.30
1.28
1.28
08-Oct-2025
08-Dec-2025