Project Completion Certificate (Ground Water)
Scheme ID: 20023355 Name of Scheme: MUNDBHAR RO WSS (BHORA KHURD WSS) No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4439 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Sep-2022 Actual Date of Completion (Capex): 29-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.13 M / 85.42 M BHORA KHURD 29.395636 77.461926
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 850 LPM / 49 M BHORA KHURD 29.395636 77.461926
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL / 12 M BHORA KHURD 29.395636 77.461926
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 200 0.043
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.953
2 HDPE 75 0.495
3 HDPE 63 7.816
4 HDPE 110 0.512
5 HDPE 125 0.309
6 HDPE 140 0.039
7 HDPE 160 0.115
8 HDPE 180 0.120
9 HDPE 200 0.083
HSC Connection
Sno. Total Nos.
1 929
Other Details
3.04
0.00
3.04
29-Apr-2024
30-Apr-2024