| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023387 | Name of Scheme: PARA KHALSA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2099 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 30-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.11/99.35 | Para Khalsa | 29.006268 | 78.313286 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 436/44 | Para Khalsa | 29.006268 | 78.313286 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 125/12 | Para Khalsa | 29.006185 | 78313414 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 125 | 0.030 | 0.030 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 63 | 4.5283 | |
| 2 | PN-6 PE100/HDPE | 75 | 0.3033 | |
| 3 | PN-6 PE100/HDPE | 90 | 0.401 | |
| 4 | PN-6 PE100/HDPE | 110 | 0.707 | |
| 5 | PN-6 PE100/HDPE | 125 | 0.133 | |
| 6 | PN-6 PE100/HDPE | 160 | 0.065 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 398 |